Postmine slopes were then superimposed on the diagrams. For the sake of continuity, it was • <br />estimated that all spoil would be graded towards the open pit at 5h:1v slopes. All highwall slopes <br />would be reduced to 5h:1v. This produced a final topography that could not only be revegetated, but <br />would also allow drainage to flow through the pit area without impounding water. !t was also <br />assumed that in all cases there would be-four standing spoils behind the open pit. This is a very <br />conservative estimate because, in most cases, reclamation grading is current to within two spoil piles. <br />A digitizer was used to balance the cut and fill volumes of material needed to create the above- <br />described topography. A swell factor of 17 percent was utilized for the bonding estimate. The <br />adjacent spoil would be dozed into the open pit and the three other spoils would be graded into the <br />adjacent v's created by the spoil (see appropriate worksheets in Attachment 25-11• <br />Highwalls will be reduced and sloped towards the open pit. This would be accomplished by drilling <br />and shooting the highwall and then dozing/ripping the blasted material into the open ph. See <br />appropriate worksheet in Attachment 25-1 for a complete listing of volumes to be dozed into the open <br />pit. <br />A Caterpillar computer program called EMF was used to determine dozer production. This program • <br />utilizes iniormation given in the Caterpillar Handbook. All tables and charts have been computerized to <br />simulate production for track type equipment. See various worksheets for production and costs. <br />The premining and postmining topography maps were compared for material movement. Although a <br />specific postmine topography map is not available fora 2004 mine closure, drainage patterns will <br />generally remain the same as the planned final topography. Due to the fact that the topographic highs <br />and lows will generally be located in the same area after mining as they were prior to mining, it is not <br />anticipated that wheel type earthmovers will be needed to backfill the final pit. <br />No box cut spoil grading is included in this estimate. The timing and location of the box pit spoil is <br />such that all box pit spoil will be reclaimed by the end of 2004, and therefore, was not included as a <br />liability in the "worst case" year. <br />Ramp grading estimates are included with spoil grading. It was assumed that ramps will be <br />graded at the same time as two spoils are pushed into the pit and, therefore, additional cost is not <br />estimated Tor this project. <br />• <br />3 Revised 11/00 <br />