Laserfiche WebLink
• Reclamation Management Fee <br />This fee represents the cost for management of the entire project. Usually this is performed by a firm <br />specializing in reclamation oversight. This was estimated per Graph 3, OSMRE Handbook at 3.8 <br />percent of the direct costs. <br />Public Liability Insurance <br />This insurance protects the Contractor against his legal liability to third persons for bodily injury and <br />property damage arising out of his own operations. This cost has been estimated at 1.55 percent of <br />the direct costs. <br />Contractor's Performance Bond <br />The performance bond guarantees the contract will be performed and the reclamation will be <br />conducted to the satisfaction of the Division. This cost has been estimated at 1.05 percent of the <br />direct costs. <br />J <br />r1 <br />LJ <br />g Revised 2/01 <br />