Laserfiche WebLink
• <br />• <br />• <br />-6- <br />~ocaLion ~n a itcatiion <br />INFORMATION CATEGORY NARRATIYE MAPS <br />2.05.3(3) Mine Facilities <br />2.05.3(4) Ponds, Impoundments and <br />Diversions <br />2.05.3(5) Topsoil (removal and ' <br />storage) <br />2.05.3(6) Overburden <br />2.05.3(7) Coal Handling Structures . <br />2.05.3(8) Coal Processing Waste and <br />Non-Coal Processing }taste <br />2.05.3(9) Underground Development <br />Haste <br />2.05.3(10) Return of Coal Processing - <br />Naste to Abandoned <br />Vlorki ngs <br />2.05.4 Reclamation Plan 2.05-1 <br />2.05.4 (2)(a) Timetables <br />2.05.4 (2)(b) Reclamation Cost Estimates) <br /> 3.00-1 <br />2.05.4 (2)(c) Backfilltng and Grading +Post-mining <br /> toPo9~'aphY - <br /> 2.05.4 (2)(c) <br />2.05.4 (2)(d) Topsoil (Redistribution) <br /> 2.05-2 <br />2.05.4(2)(e) Revegetation <br /> 2.05-2 <br />2.05.4(2)(f) Disposal of Debris, Acid- <br />Forming and Toxic-Fortaing <br />Materials <br />