Laserfiche WebLink
• <br />n <br />LJ <br />-3- <br /> Permitted Actual Proposed <br />8. Mineral ownership: <br />(indicate currently <br />permitted acre for each) <br />Federal: 0 ac., 0 0 <br />State: o ac., 0 0 <br />Private:312 ac., 312 312 <br />Indian: 0 ac. 0 0 <br />9. Surface Qwnership: <br />(indicate currently <br />permitted acreage for <br />each) <br />Federal: 0 ac., <br />~ 0 0 <br />State: <br />0 ac., 0 0 <br />Private:33'- ac., 312 312 <br />Indian: o ac. 0 0 <br />10. Affected area (in acres) 73.5 73.5 <br />11. Disturbed area (in acres) 73.5 73.5 <br />12. Acreage of area reclaimed 0 0 <br />in previous pertait term <br />a) backfilled and graded n/a 0 n/a <br />b) retopsolled n/a 0 n/a <br />c) reseeded n/a 0 n/a <br />13. Acreage for which bond 73_5 73.5 <br />has been released <br />a) 60 percent n/a 73.5 n/a <br />b) 85 percent n/a 0 n/a <br />c) 100 percent n/a 0 n/a <br />14. Renewal Terra Requested <br />(Years) n/a n/a <br />ite: If the application contains proposed (new) acreage, th en a permit <br />revision application form m ust also be com pleted for those acreages. <br />15. Type of Mine (check one): Underground, x. Surface, <br />Combined Surface and underground, _ Load-0~ Other- <br />16. Current Permit Status (check one): Active, Temporary Cessation, <br />x Permanent Cessation (reclamation only), '~ispended <br />17. Current Estimated Life of Mine in years: 0 0 <br />• <br />