My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133709
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133709
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:23 PM
Creation date
11/26/2007 1:29:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
POST-MINING DRAINAGE CONTROL
Section_Exhibit Name
TAB 7 APPENDIX 7-12
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l998 Srnna f1:11rar' f'ofp-d li+un¢ Dnnunpr Co++no! • I <br />INTRODUCTION <br />As part of the final reclamation plan for the Seneca II bline, this appendii outlines the design <br />procedures and fmal designs for postmining drainage channels located on the site. The designs are <br />for both planned and existing channels. <br />The locations of the channels are shown on Exhibit 7-19. The profiles for each channel are shown <br />on Exhibit 7-20. Appendix 2. contains the h}'drologic calculations and Appendix B contains the <br />hcdraulic calculations for all ditches. <br />The following channels were designed: <br />• SII PiVI-1 • S[1 PM-10 SII P\I-19 <br />• SII PI`I ? • SII PI`I-] 1 • SII Pi\I-20 <br />• SII Pb43 • SII Pi\I-12 • SII PI`1-21 <br />• SII Pi\I-~I • S1I Phi-13 • SII PSI-2'' <br />• • SII Pht-5 • SII Phi-I } • SII Ptv[-23 <br />• SII P\(-6 SII Piv(-IS <br />• SII PnI-7 SII PT\I-16 <br />• SII P(\I-8 • SII PT`[-17 <br />• SII PDI-9 SII Pbt-18 <br />All of the channels will be petmanent and were designed to conccol the peak discharge from the l0- <br />cear, 2~1-hour storm event. Because parts of channel SIIPI\44 is adjacent to a Fill area, it was designed <br />to control the peak discharge tiom the 100-}'ear, 34-hour storm ecznt. --11so, because the rotal <br />watershed for the lower put of channel SIIPD{-( is greater than one square mile, it was designed to <br />control the peak dtscharge From the ]00-tear, 34-hour srotm event. <br />In addition to the permanent channels, the following existing cukerts were evaluated as permanent <br />structures: <br />• ?A, 3A, 1~A, and 18.-1 <br />• The location of [he adverts are shown on Exhibit 7-19. Appendix L contain; the hedraulic <br />calculations for all culverts. <br />7-R-I Revised 9/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.