My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133609
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:16 PM
Creation date
11/26/2007 1:22:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
6/2/2006
Section_Exhibit Name
2.05.3 Operation Plan - Permit Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br />• In the spring of 1999, MCC will drill two horizontal holes from the surface, at the abandoned <br />main mine site substation, to intercept small sumps in the F-Seam to drain the water that <br />accumulates in these sumps. The water that accumulates in these sumps is primarily surface <br />water and near surface groundwater that infiltrates through the coliuvium above the F-Seam and <br />into the F-Seam workings. Once the water is in the sump, it then infiltrates through the F-Seam <br />floor and into the unstable surface soils within the main mine site landslide. It is important that <br />water sources to the surface soils be controlled in order to improve the local and global stability. <br />These two holes are a test to determine if this method of draining the sumps is feasible. These <br />sumps aze located near the main F-Seam portals. They are not part of MCC's mine water <br />handling system. These sumps have not been nor will be used to handle a large inflow event. <br />The sumps are too small and if they overflow, they will flow into the belt and travel ways. Drain <br />A will be drilled approximately 1,100 feet and into the floor of one of the main collection sumps. <br />Drain B will be drilled approximately 1,400 feet, and into the bedrock fracture zone below the F- <br />Seam sumps. If the holes are successful, MCC estimates that approximately 22 gpm will flow <br />from the two holes and into pond MB-1. If the holes are successful, MCC will permit and <br />construct additional drains that will remain upon final reclamation. In addition, MCC will <br />update Exhibit 14c to include these drains and evaluate them for the final reclamation plan. <br />(4) Ponds, Impoundments, and Diversions <br />During the course of construction and operation of the mine facilities at West Elk Mine, every effort <br />is made to minimize water pollution. It is MCC's intent to dischazge water from sediment ponds, <br />Small Area Exemptions, and from the mine in compliance with all applicable effluent limitations. <br />To fulfill this commitment, all surface drainage from the affected mine area is collected and treated <br />prior to being discharged from the pemtit area. All surface runoff from undisturbed areas is directed <br />away from the affected mine azea through diversion channels. Maps S4, S4A, and S4B show the <br />distribution of sediment control structures at West Elk Mine. Map S4 and Map S4A identify the <br />sub-watershed drainage basins, tributary drainage basin information, and ditch/culvert layouts in <br />conjunction with the main surface facilities area and Lone Pine Gulch, respectively. Maps lE, 2E <br />and 3E in Exhibit 66 identify the watersheds in the Sylvester Gulch Facilities Area. Map 54B <br />shows the ditch and culvert locations in conjunction with the Sylvester Gulch Facilities Area. The <br />following sections deal with each specific hydrologic protection measure. <br />Hydrolo2ic Studies and Metf:odolosv <br />Studies have been completed to estimate the peak runoff and flood volume for storms having <br />specific recurrence intervals for the West Elk Mine azea. Exhibit 44 is the report used in the design <br />of the original sedimentation ponds (MB-1, MB-2, and MB-3), ditches and culverts by Merrick and <br />Company. This report was submitted to the State Engineer for the approval of the three <br />sedimentation ponds MB-l, the original MB-2, and MB-3, and the freshwater pond, FW-1. <br />Approval was received on February 3, 1981, and is included in Exhibit 4S. Exhibit 66 contains the <br />new designs for ponds MB-2R and MB-3. The Exhibit 43 and Exhibit 44 designs are no longer <br />valid for these ponds. Exhibit 66 contains an as-built drawing that reflects the addition of a dike in <br />the pond to create a north and south cell. However, the drawings included in Exhibit 43 do <br />accurately reflect other structures associated with MB-1 (i.e, the primary and emergency <br />spillways). Exhibit 66 also contains the design information for SG-1 located at the Sylvester Gulch <br />2.05-28 Revised June 1005 PRIO; Rev. January 2006; Rev. March 2006; Rev. ,4pri! 2006 PR70, May 2006 PRIG <br />
The URL can be used to link to this page
Your browser does not support the video tag.