Laserfiche WebLink
COLORADO MINED LAND RECLAMATION DIt'ISION <br />ESTIMATING FORM -_ HYDRAULIC E%CAVATOR WORN <br />_~r-r4- _ ~.4- r_ ~. ~r-_44-4-~.-4_ 1 <br />Teak No. 16 _ Prep. By: TDG Permit No. C-81-015 <br />Date -"07/02/90 Filename: C015-16 Operation: FruitaM1ll 3 12 <br />Permit Action Reclamation Only Permit <br />L___4_..__4_____~rti ~r..__~.___4___..__s_.._s_..r _M1 _.`_____r_ <br />Task Description Periodic ditch/rill/gully maintenance over bond Lerm <br />HOURLY EQUIPMENT COST: <br />Labor Single, Double, or Triple <br />County: MESA Zone 1 Shifts S <br />Machine Deacript. CAT 205 LC (track mountedl__ __ __ <br />4r.. ~.-4~rr_4~.__-r-.._V_~r___~r4 _ __.w__.._~.v4_______ <br />Cost Breakdown: Utilization Equipment <br />" " " " " " " adjustment: Filename: <br />Ownership cost/hr = 516.48 N/A 205-LCES <br />Operating & Overhaul Cost/Hr = 514.09 (100%) " " " "` <br />Operator cost/hr = 520.08 N/A Total Fleet <br />--------- Cost/Hr: <br />Total Eqpt. Unit Cost/Hr = 550.65 <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: N/A <br />Initial " " " " " " Swell Loose <br />Volume: `-..-....__N/A_ Factor: ~_`- "N/A_ Volume: _`N/A- LCY <br />Source of quantity take-off: N/A <br />...Source of est. swell factor: N/A <br />HOURLY PRODUCTION: <br />Cycle Time - Basic cycle time vs job condition rating N/A <br />" " " " " - Selected time value within basic rating N/A <br />Basic cycle time = N/A min. <br />Bucket Capacity -------____.. <br />Rated Capacity: N/A LCY (nominal heaped) <br />Bucket Fill Factor: N/A N/A <br />Adjusted Capacity: N/A LCT <br />Job Condition Correction Factors <br />Site Altitude = 5,700 ft. <br /> <br />- Altitude Adj. = N/A <br />- Job Efficiency = N/A <br />Net Correction N/A <br />Unadjusted Hourly Unit Production N/A LCY/Hr <br />Adjusted Hourly Unit Production N/A LCY/Hr <br />Adjusted Hourly Fleet Production _..___N/A LCY/Hr <br />JOB COST: <br />Fleet size 1 Unit(s) Total Job Time <br />Unit Cost N/A /LCY Total Job Cost <br />40.00 Hours <br />524026`00 g~ <br />