Laserfiche WebLink
~' COLORADO MINED LAND RECLAMATIOI: DIVISIOI: <br />~~ ESTIMATING FORM - HYDRAULIC E%CAVATOR WORK <br />___~.._.~r.._r_r..r..____r_..r __r..___r_r.... _.._.`w._ <br />' • Tsak No. _`--10___-- Prep. By: TDG Permit No. 0 81:015 <br />__ _.Y_4__4 4.. <br />Date 02/16/90 Filename: C015-10 Operation: Fruits M1 rt 112 <br />Permit Action Reclamation Only Permit <br />Task Description Re-establish draina_ge_around regraded coal pile <br />__Y_4__.. _.. __4__~r4.v r 4__s-r_ss_.._M1_-_-1r_~r_-w_4___ <br />HOURLY E@UIPMENT COST: <br />Labor Single, Double, or Triple <br />County: MESA Zone 1 Shifts S <br />Y _ _.. L _ _ ___ _ • _ _ _ _ _ _ _ _ _ _ _ .r_ r 4 _ <br />Machine Descript. CAT 205 LC (track mounted) <br />Coat Breakdown: Utilization Equipment <br />" " " " " " " adjustment: Filename: <br />Ownership cost/hr = S16.48 N/A 205-LCEX <br />Operating & Overhaul Cost/Hr = 514.09 (100X) " " " "` <br />Operator cost/hr = 520.08 N/A Total Fleet <br />--------- Cost/Hr: <br />Total Bgpt. Unit Cost/Hr = 550.65 550.65 <br />..~ 4_.._- _.w___..4 r.._ <br />MATERIAL @UANTITIES: <br />Beg. <br />Volume: 710 BCY <br />• Initial ==`""""` Swell `__"~- Loose `-_"`_-- __+ <br />Volume: 710.0 BCY Factor: 1.330 Volume: 944.3 LCY <br />_4_~r_____ _ 4 <br />,, Source of quantity take-off: App. %-sec. F-F' k Map No. 3 <br />Source oP est. swell factor: Cat Handbook (BCY-LCY swell for Dec. Rock 50-50: <br />i HOURLY PRODUCTION: <br />Cycle Time - Basic cycle time vs job condition rating BELOW AVG. <br />" "" " " - Selected time value within basic rating MEAN <br />Basic cycle time = 0.350 min., <br />Bucket Capacity """"""` <br />Rated Capacity <br />Bucket Fill Factor <br />0.680 LCY (nominal heaped) <br />0.900 Other - soil, boulders, roots 180-100X) <br />Adjusted Capacity: 0.612 LCY <br />Job Condition Correction Factors - Altitude Adj. = 0.920 <br />"""""""""""""""" - Job Efficiency = 0.830 ( lsh/~ <br />Site Altitude m 5,515 ft. -------- <br />" "" " Net Correction 0.764 <br />~ Unadjusted Hourly Unit Production 104.91 LCY/Hr <br />Adjusted Hourly Unit Production _ 80.11 LCY/Hr <br />• Adjusted Hourly Fleet Production `80 11 LCY/Hr <br />JOB COST: <br />fileet size 1 Unit(s) Total Job Time: 11.79 Hours <br />Unit Coat 50.632 /LCY Total Job Cost: 5597.01 <br />________ ________-- 8Y <br />