My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133445
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:07 PM
Creation date
11/26/2007 1:11:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
2.05.4 THRU 2.05.6(3)(a)
From
p 56 to 99
Section_Exhibit Name
PART 2.05 OPERATION and RECLAMATION Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.4 Reclamation Plan <br />(2)(a) (Cont'd.) <br />soonest. Preparation of the rock fill outslopes would take approximately on <br />month. Revegetation, including broadcast or hydroseeding, fertilizing and <br />mulching would require an additional month. Excessive soil moisture and <br />snow cover would affect the timing of reclamation. Wet soils could not be <br />evenly distributed and seeding has proven to be unsuccessful on top of <br />snow. <br />r1 <br />LJ <br />(2)(b) Cost estimates and supporting calculations for the demolition and final <br />reclamation of the east and west mine sites are provided in the Final <br />Abandonment Appendix 6A. <br />(2)(c) See Maps 6A-5A through 6A-50 in the Final Abandonment Appendix in <br />Volume 6A. Also see sheet 9 of the west portals design in Volume 6B. <br />All fills will be placed on ground that is completely cleared of vegetation and <br />root growth. Fill material will be placed in horizontal lifts, adjusted to a <br />moisture content at or above optimum moisture and compacted to at least <br />90% of the maximum standard Proctor density. Compaction will be tested <br />by an independent laboratory and results will be made available to the DMG. <br />The operator requested and received a variance from approximate original <br />contour restoration requirements for the east mine, including the areas of the <br />proposed rock slopes portals and fills, to enhance the postmining land use <br />of rangeland. The access road system will provide greater economic <br />opportunities from improved grazing and public access. <br />No significant change in the final reclaimed configuration of the east mine is <br />proposed for the rock slopes, though backfilling of the existing portal and <br />parking lot levels to the approximate approved configuration would be <br />completed during construction of the proposed rock slope portals and <br />entries. A drainage ditch on the parking lot fill would be relocated to drain <br />to the southeast end of the fill rather than generally over the fill outslope to <br />the crushing and screening level below. Refer to the Golder Associates <br />designs in the Mine Facilities Appendix, Volume 8A. <br />• <br />TR 96-028 60 <br />TR-as/Rn-o3 <br />~PPRovEO Ivry/99 <br />Rev. 4/27198 <br />
The URL can be used to link to this page
Your browser does not support the video tag.