Laserfiche WebLink
<br /> <br />Mr. Edward C. Rosar <br /> <br />Exhibit E - Recla~n~,tion Plan <br />-2- <br /> <br />October 21, 1983 <br />~1,~ The second paragraph of page E-1 addresses leaving Pilot Plant <br />facilities, if the commercial phase is developed, pursuant to Rule <br />6.5(h)(iii) of the Rules and Regulations. As a point of clarification, <br />~,~'S does the operator realize the rule and regulation cited pertains to <br />haulage roads or final cuts? Also, if the commercial phase is <br />developed, all the operator would need to do is include those facilities <br />fro,n the Pilot Plant that are needed in the permit application for the <br />commercial phase(similar to what has occurred with including those <br />facilities from per•init No. 83-56 into this pe rnrit application). <br />The operator <.:pecifies on page E-3 that selected species "may" be za~~, cR`"~~°," <br />used to seed the topsoil stockpile. Please identify the species that u.rs„a2~ •^"`c^'- <br />will be used and give the rate to be seeded of each species. ~"^", ~''P" r'0` <br />y, 5,,,, gyn.-fcwve2 <br />What slope gradients are proposed for the topsoil stockpile? To <br />\~provide a suitable slope for establishing vegetation and to maintain <br />~~' soil quantity, the Division recommends a slope gradient of no steeper <br />than 3h :1 v. <br />The text, on F~age E-6, specifies "concrete foundations and slabs <br />} ~ will be broken and buried on-site". How deep will this material be <br />~~~ ~~~ buried? Also, what; is the anticipated amount of concrete foundations <br />a ~ and slabs that will need to be buried? <br />e ~ What parameters will be measured and at what intervals will these <br />oA parameters be measured at the three monitoring wells? Please provide <br />',~ copies of the measured parameters after each monitoring. <br />L'.ti <br />Exhibit G - Geology and Hydrology Information <br />To maintain the confidentiality of this exhibit, questions pertaining to <br />the geology and hy,irology of this site will be forwarded under a <br />separate cover. <br />`~ Exhibit M - Local foverrnnent Approval <br />~~' 1. Please sub,nit I~roof of compliance with Rio Bianco County zoning at <br />the earliest convenience. ~,_~ „_~-f3 ~ w.•`~ ~` ~-r <br />Miscellaneous <br />1. Please provide proof of publication at the earliest convenience. <br />This proof can either be a signed affidavit from the newspaper doing the <br />publication, or the actual page from the newspaper each of the four <br />times the notice w•ss published. <br />l,.~ ~V.~ = IV ~VG~ .~~j 1~x~ CGM MtZ~nT <br />3•, N~~ <br />