My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133350
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:02 PM
Creation date
11/26/2007 1:06:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978039HR
IBM Index Class Name
Permit File
Doc Date
8/14/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Lost (E) <br />________I______________________________________________________________ <br />2 ~ Backtill Portal ~ E119 <br />6 I Bulkhead Portal Closure E2,500 <br />Subtotal (K ): E2, 619 <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ Task Description ~ Cost (S) <br />________I__________________________________________________I____________ <br />~ n/a ~ <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />________I__________________________________________________I___________. <br />9 ~ heed control for xalogeton, before seeding ~ E270 <br />5 ~ Demolition - remove portal shed, bldg, etc. I E5,680 <br />7 ~ Seeding reveg affected lands ~ E1, 285 <br />Fencing <br />8 Mob/Demob from Cortez ~ E2, 963 <br />Subtotal (M): E10, 198 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 516,421 <br />1. ~ Public Liability Insurance.... 1.850X of dir. ~ E255 <br />2. ~ Contractor's Performance Bond 0.975X of dir. E16D <br />3. ~ Contractor's Profit........... 10.OOX of dir. ~ E1, 642 <br />4. ~ Job Superintendent.. <br />________________________________________________________________________ <br />Subtotal (A): E2, 057 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E18,478 <br />8. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description ~ Cost (S) <br />________I__________________________________________________I____________ <br />1. ~ Minerals Program Admin. Fee at S.OOY. of cntr.l E924 <br />________________________________________________________________________ <br />NET INDIRECT COST PERCENTAGE: 18.15X Subtotal (B): E924 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E2,981 <br />TOTAL PERFORMANCE BOND AMDUNT (direct plus indirect costs): 519,402 <br />l1. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Lost (E) <br />________I_____________________________________________________________. <br />
The URL can be used to link to this page
Your browser does not support the video tag.