Laserfiche WebLink
<br /> <br />• <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmem of Nawral Resources <br />I J 1 } Sherman 51 ,Room 215 <br />Denver, Colnr. rio 80207 <br />Phone 13011 fl66-7567 <br />fAK: 17071 8J2~8106 <br />December 31, 1996 <br />• <br />III IIIIIIIIIIIIIIII OF COLORADO <br />I~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Mr. Jeff Gregg Governor <br />Hall-Irwin Construction Co. <br />P. O. BOX 519 fames5 Lochhead <br />Greeley, CO 80632 Esecmrve Otrecwr <br />Michael B. LOng <br />Re: Firesties Pit, M-96-060, Par~it Issuance - 112 Construction Material Dlvlslon Director <br />Operation <br />Dear Mr. Gregg: <br />On December 31, 1996 the Division of Minerals and Geology found Hall-Irwin Construction <br />Co. to have satisfied the applicable requirements of C.R.S. 34-32.5-101 et ee~e. for <br />obtaining a mining and reclamation permit. Therefore, a permit is being issued. Two <br />signed originals of the permit have been executed. we have kept one copy for our files <br />and are enclosing one copy for your use. It ie your responsibility to comply with all <br />of the terms of the permit. <br />1. All of the original application materials, ae amended and supplemented, are an <br />integral part of your permit. They have been incorporated into the permit by reference. <br />We presume that you have a copy of all of these materials; therefore, none have been <br />enclosed with this mailing. We euggeet that you keep a copy of the permit and the <br />permit application at the mining operation as a reference for operating personnel, to <br />help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described <br />in the permit may require a modification to the permit. We euggeet consulting the <br />Construction Materials Rules and Regulations and/or contacting ue to determine if a <br />revision to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 to <br />Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, December 31, you moat submit an annual <br />fee and an annual report to ue. The annual fee for this permit ie $550.00. Please <br />consult the Act, Rules and Regulations, and your permit for specific annual report <br />requirements applicable to your mine. <br />if you have any questions, please the contact the Division. <br />Sine r , <br />MICHAEL B. LO~~ <br />Divie ion Director <br />MBL/CLK/BDC <br />Enclosure <br />cc: Gary J. Tuttle, Tuttle Applegate Inc. <br />M-AP-25 <br />