Laserfiche WebLink
• Support Facilities- Buildings ............................ Attachment 2.05.3(3) -10-101 <br />Coal Handling Structures .............................. Attachment 2.05.3(3) -10-101 <br />Support Facilities and Utility Installations .................. Attachment 2.05.3(3) -10-101 <br />. ...................................... Attachment 2.05.3(3) -10-101 <br />Temporary Relocation for CC Company West Lateral Ditch .... Attachment 2.05.3(3) -10-102 <br />Design Details ................................. Attachment 2.05.3(3) -10-103 <br />Timing ....................................... Attachment 2.05.3(3) -10-103 <br />Temporary Relocation of BB Road ....................... Attachment 2.05.3(3) -10-104 <br />Main BB Road Detour Design Details .............. .Attachment 2.05.3(3) -10-104 <br />Other Facility Relocations .............................. Attachment 2.05.3(3) -10-108 <br />Special Features -Pit Turn Slot Cut- Amendment Area ....... Attachment 2.05.3(3) -10-108 <br />. Sediment Pond Slope Stability ....................... . . . <br />1.General Pond Information <br />Foundation and Embankment Material Characteristics . . <br />Strength Parameters Used in Slope Stability Analysis .. . <br />Embankment ................................. . <br />Foundation ................................... <br />Other Parameters Used in the Slope Stability Analysis <br />...................................... <br />Factor of Safety Cases and Results ............... . <br />Conclusions ....................... <br />Attachment 2.05.3(3) -10-109 <br />Attachment 2.05.3(3) -10-109 <br />Attachment 2.05.3(3) -10-110 <br />Attachment 2.05.3(3) -10-113 <br />Attachment 2.05.3(3) -10-113 <br />Attachment 2.05.3(3) -10-113 <br />Attachment 2.05.3(3) -10-113 <br />Attachment 2.05.3(3) -10-115 <br />Attachment 2.05.3(3) -10-116 <br />LIST OF TABLES <br />TABLE 2.05.3(3)-10-1 AMENDMENT AREA COLLECTION DITCH AND DIVERSION DITCH <br />DESIGNS ..................................... Attachment 2.05.3(3) -10-67 <br />TABLE 2.05.3(3)-10-2 AMENDMENT AREA CULVERT DESIGNS <br />............................................ Attachment 2.05.3(3) -10-68 <br />Table 2.05.3-10-3 Timing of Road and Irrigation Ditch Detours and Restorations <br />............................................ Attachment 2.05.3(3) -10-107 <br />(REVISED 2/00) <br />