My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133316
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:01 PM
Creation date
11/26/2007 1:05:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Previous Findings and Conclusions
Section_Exhibit Name
1996 Appendix F
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surface water monitoring is performed upstream and downstream of disturbed <br />areas at the mine and the loadout. The upstream site along Hayden Gulch has <br />• minimal intermittent flow, as the mine is located at the top of the drainage. <br />The applicant monitors flow in Hayden Gulch below the facilities, on the north <br />side of the road, and below the mine site and Pond H-G-B, on the south side of <br />the road. A spring and seep survey each spring will monitor contributions <br />from spoils springs to the surface water regime. This monitoring plan is <br />adequate to detect any impacts which could occur. <br />The operation is in compliance with the requirements of this section. <br />B. Ground~Water <br />• <br /> <br />Section 2.04.7 (Yolume I), Appendix L (Volume 5), and Appendix R (Volume VII) <br />contain information on ground water. <br />Ground water monitoring at the mine site has provided adequate quantitative <br />information during the first permit term. but marginal qualitative information <br />due to grout contamination. As quantitative impacts were the expected <br />consequence of activities during the active mining phase, monitoring <br />ob,~ectives were basically met. However, the development of a salt plane is <br />the probable ground water impact following backfilling, therefore, it is <br />imperative that adequate monitoring sites be established by the Fall, 1987, <br />sampling period. The permittee shall perform development work on the existing <br />wells in early spring, and monitor to identify artifacts of the grout <br />contamination. Should the wells continue to exhibit contamination the <br />permittee shall submit a ground water monitoring plan for monitoring the lower <br />coal unit and the upper coal unit by May 15, 1987, following development of <br />mine area wells and subsequent monitoring. Construction and development <br />schedules shall be included as Well as a detailed outline of well completion <br />activities. Site locations, frequency of monitoring and water quality <br />parameters shall be tabulated. Subsequently the following stipulation is <br />imposed. <br />STIPULATION N0. 3 <br />THE PERMITTEE SHALL SUBMIT AN EVALUATION OF THE MINE AREA WELLS FOLLOWING <br />DEVELOPMENT WORK AND SUBSEQUENT MONITORING ON OR BEFORE MAY 15, 1987. SHOULD <br />WELLS CONTINUE TO EXHIBIT CHARACTERISTICS OF GROUT CONTAMINATION, THE <br />PERMITTEE SHALL SUBMIT A REYISED GROUND WATER MONITORING PLAN FOR MONITORING <br />THE LOWER AND UPPER COAL UNITS BY MAY 15, 1987, <br />With acceptance of the preceding stipulation, the operation is in compliance <br />with the requirements of this Section. <br />VII. Alluvial Valley Floors - Rules 2.06.8 and 4.24 <br />The permittee will not affect any lands designated as <br />as a study performed by Bishop Associates, Inc., July, <br />any alluvial valley floors in the Hayden Gulch or Dry <br />alluvial valley floors, <br />1981, did not identify <br />Creek drainages. <br />-9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.