My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133311
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:00 PM
Creation date
11/26/2007 1:05:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
Permit File
Doc Date
5/20/2004
Doc Name
EXH L & N
From
TETRA TECH RMC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment for Exhibit L <br />Hazeltine Mine -Table for Reclamation Cost Estimate <br />Activity Quantity Units Unit Costs I Cost <br />1 Create overburden sideslopes (3:1) on mine highwall west sid <br />of Phase 2 (2600 It) <br />2 Replace 6" of topsoil on the shoreline (3:1) above high water <br />elevation in Phase 1B & Phase 2, and disturbed area in Phase <br />3 Seed and mulch shoreline above hish waterline for all of Pha: <br />00 <br />or <br />129,100 CY $ 0.84 $ 108,444.00 <br />9,950 CY $ 0.84 $ 8,358.00 <br />11.3 Acres $ 400.00 $ 4,520.00 <br />reclaimed <br />I Create overburden side slopes from finished Bade to top of <br />resource for stripped azea 1,877 CY $ 0.84 $ 1,576.68 <br />2 Replace topsoil on entire azea 28,600 CY $ 0.84 $ 24,024.00 <br />3 Seed and mulch entire area 28.1 Acres $ 400.00 $ 11.228.00 <br />Haul Road and Ditch Crossings <br />1 Scarify Bound <br />2 400 If of haul road reclamation 6" topsoil <br />3 Haul Road area seed and mulch <br />4 Fulton Ditch Crossing -remove rail caz and footings and <br />restore crossing area <br />5 Bull Seep Ditch Crossing -remove culverts and restore <br />D. Plautiugs <br />1. Plaut 50 Cottouwood Trees <br />I Plant 50 Cottonwood Trees <br />0.37 Acres $ 150.00 $ 55.50 <br />300 CY $ 0.84 $ 252.00 <br />0.37 Acres $ 0.84 $ 0.31 <br />1 LS $ 2,000.00 $ 2,000.00 <br />1 LS $ 2,000.00 $ 2,000.00 <br /> <br />Total Disturbance Costs $ 174,958 .49 <br />Contractor Mobilization (8%) $ 13,996 .68 <br />Overhead (18.5%) $ 32,367 .32 <br />Administration (5%1 $ 8,742 92 <br />RECEIVED <br />MAY 2 0 2004 <br />Division e] Minerals end Geology <br />AGGREGATE INDUSTRIES - HAZELTINE MINE MLRB 112 PERMIT <br />
The URL can be used to link to this page
Your browser does not support the video tag.