My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133200
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:55 PM
Creation date
11/26/2007 12:58:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
Permit File
Doc Date
4/6/2001
Doc Name
Waivers and Bond Estimate
From
ENVIRONMENT INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Date <br />User <br />oSApr-2001 Permit orjob no.: M-2000-158 <br />ESC Abbreviation : none <br /> Filename : M158-000 <br />Agency or organization name :Division O(Minerals 8 Geology <br />Permit orjob action :New 112 Permit Application <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Pump Pit Water to Facilitate Backfilling & Grading pumping 1 877.00 826,336 <br />002 ~ Back(118 Grade Slopes dozer 1 239.30 $32,788 <br />003 '-Replace Topsoil on 35 Acros scraped 1 110.69 $20,421 <br />004 -Revegetate 35 Acres revege 1 40.00 $12,354 <br />005 ~ Mobilization/Demobilization mobilize 1 3.78 $2,492 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> i T <br />~ ~ <br />~ I ~ <br /> <br /> <br /> <br /> <br /> <br /> I <br /> <br /> <br /> <br /> <br />SUBTOTALS' 1,270.77j ~ <br />$94,391 <br />• inGutles mflauon tailor ad7usunent of . NA % TOTAL DIRECT COST' ='i 594,391 <br />:CT COSTS <br />OVERHEAD AND PROFIT- Llabillty lnSUfanCe: 1.55 %O(dlreCt total= $1,463 <br />Performance bond : 1.05 % o(direct total = $991 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % o(direct total = $9,439 <br />'not requiretl (or eqp. operator serves as super) TOTAL O 8 P = $11, 893 <br /> CONTRACTAMOUNT (direct+08 P)= $106,284 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr NA total = $5, 314 <br />CONTINGENCY- NA' NA total= NA <br />'conhnpenaes accountetl for at tasklevel TOTAL INDIRECT COST= $17,207 <br />70TAL BOND AMOUNT (direct+ indirect) _ $111,598 <br />Site : S 8 H Mine <br />State :Colorado <br />County :Weld <br />
The URL can be used to link to this page
Your browser does not support the video tag.