Laserfiche WebLink
EXHIBIT D----RECLAMATION PLAN <br />(f), Actual costs to reclaim the site based on what it would <br />cost the state using an independent contractor to complete <br />reclamation. <br />Backfilling $1.00 per cubic yard $7,000.00 <br />Grading $ 700.00 <br />Top Soil Application (top soil is already on the property so <br />no additional application would be <br />needed). <br />Seding 10 lbs/1000 sq. ft. <br />43,560 sq. ft. in an acre <br />$6.99 per 10 lb bag <br />Mulching $20.00 per acre <br />Fertilization Hi Yield Ammonium Sulfate <br />Labor <br />Includes Equipment <br />Total cost for reclamation <br />$94.09 <br />$200.00 <br />$ 30.00 <br />$2000.00 <br />$10,024,09 <br />Determine and specify the point during the operation when the <br />site has reached a point of maximum disturbance. <br />Our expectancy is December 31, 2011. <br />