Laserfiche WebLink
EXHIBIT D -MINING PLAN <br />Most of the material in phases I and II of our 110 permit has been mined. This <br />area will be used as our staging, crushing and stockpile area. Mining will <br />continue east all akxig the north/south line. As the highwall of gravel is mined <br />back, we will continue to move our crusher and stockpiles eastward to be in <br />close proximity to the highwall of gravel. This will allow us to begin reclamation <br />on the west side of the permit area as mining continues. This will allow us to <br />keep the disturbed area to 15 or less acres with an ongoing mining and <br />reclamation operation. Mining will be from west to east. <br />