My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133123
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:51 PM
Creation date
11/26/2007 12:53:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987171
IBM Index Class Name
Permit File
Doc Name
BOARD PRESENTATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mark A. Heffner, Plant Ecolog~~ist <br />37 East Colorado Aveuue <br />Denver, CO 80210 <br />(303) 722-9067 (Voice and Fax) <br />~- <br />Vegetation ecology <br />Land reclamation planning <br />Visual Impact analysis <br />Documentary photography <br />November 17, 1994 <br />James Dillie <br />Division of Minerals and Geology RECEIVED <br />Rm 215 Centennial Bldg. <br />1313 Sherman St. N~~ ~ ] 19~ <br />Denver, CO H0203 <br />Division of Mti,erais 8 Geology <br />RE: Regarding your letter to R.D. Von Engeln, Nov 14, 1994. <br />File no.: M-87-171 Fountain Colony Pit <br />Dear Mc Dillie: <br />After receipt of your letter I discussed the matter with my client Mr. R.D. Von Engeln. Upon <br />consideration of the many facets of this issue Mr. Von Engeln desires to withdraw, at this <br />time, the request for reconsideration of the previous approval. Negotiations are continuing and <br />he is hopeful that agreement can be reached in the near future. But at this time there is no need <br />to move forward with reconsideration or permit modification. It is clear that under certain <br />conditions there would need to be some modifications to the original plan in addition to the <br />previously discussed matter of bringing the permit and plan up to date before work could <br />actually begin. <br />On behalf of Mr. Von Engeln 1 am therefore requesting that you remove the matter from the <br />December agenda and allow the issue to continue as it has in the past. If and when agreement <br />is reached regarding any development of the site for mining, I will inform you of such. We can <br />then decide, with the benefit of a clear direction regarding the future of the site, what exactly <br />needs to be done to allow issuance of the permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.