Laserfiche WebLink
I in Appendix A.) Sediment entering the storm drain inlet will be controlled through the design <br />improvements discussed above and through the use of best management practices. <br />The proposed grading and paving of the facility site will minimize the amount of stormwater and <br />sediment from the site that now drains down the access road. Sediment entering the storm drain <br />inlet in runoff from the road and other contributing azeas will be controlled by using straw bales as <br />sediment filters. Straw bales will be staked around the perimeter of the storm drain inlet as shown <br />on Drawing 2 in Appendix A. The straw bale filter will be routinely inspected and repaired as <br />needed. Accumulated sediment higher than half the depth of the bale filter will be removed. <br /> <br />West E!k Mine Tmin Loadoat Environmenml Improvements Shepherd Miller, !nc <br />p1~~JOT,spaNg,mt.eoc 8 July 7997 <br />