Laserfiche WebLink
s • <br />Summary of Impacts to Water Resources <br />The proposed operation will have tempor im~~~acts ~on both surface and groundwater in the <br />local area. The mining and reclamation plan is d~to m minize the extend o h e <br />impacts. The operator has proposed mitigation to address these impacts. <br />Figure G-1. Well Location and Monitorine Plan <br />This Figure is included after this page. <br />