Laserfiche WebLink
<br />~_ <br /> <br /> <br /> <br />ACMU ACEC INTERIM ACTIONS FOR CULTURAL RESOURCES <br />SITE/AREA OBJECTIVES <br />(Outcome desired) ACTION <br />2) Protection. a) Fence pictographs away from abrasion. <br />b) Stabilize tower. <br />c) Stabilize roomblock area. <br />3) Improve data base. a) Complete detailed site map of ruin area. <br /> b) Complete Class III of 80-acre unit. <br />c) Determine lines of site to other major sites in <br />area; based on tocaer portals. <br />Hamilton Mesa <br />1) Improve data base. a) Completing Class III Inventory of Bowdish Canyon <br />(400 acres). <br />b) Complete Class IZI <br />c) Complete Class III <br />d) Complete Class III <br />acres). <br />e) Synthesis of Paleo <br />regional research <br />of Rincon Canyon (850 acres). <br />of Hamilton Mesa (1800 acres). <br />of remaining areas ( 2000 <br />Indian and Archaic data in <br />iesign. <br />2) Protection. a) Fence Bluewater Ruin (SMT4355). (4-strand barbed <br />wire and steel posts.) Fence in upper spring. <br />b) Map access routes and monitor high visibility <br />resources. <br />Cross/Ruin Canyon <br />1) Improve data base, a) Class III Inventory of bottom lands of Cross and <br />Ruin Canyon (450 acres). <br />b) Class III Inventory of Ruin Canyon (mostly slopes) <br />(3000 acres). <br />4+s- . <br />15 <br />