Laserfiche WebLink
<br /> Pit No. 1 <br /> <br /> BASIC RECLAMATION COSTS BROKEN DOWN AS FOLLO47S: <br /> <br /> A. LEVELING AND GRADING: <br /> 1. 2000 Yd3/acre at $ 0.15 Yd3 $ 300 /acre <br /> 2. Equipment to be used Dozer, Loader, 81ade <br /> 255 acre x 300 = 76,500 <br /> B. TOPSOILING: <br /> 1. 2000 Yd3/acre at $ 0.25 Yd3 $ 325 /acre <br />' 2. Equipment to be used <br /> 46 acre x 325 = 14,950 <br /> <br /> C. RESEEDING: <br /> 1. 50 Pounds of seed at $ 40 /a~:re <br /> 2. 15 Pounds of cover crop $ 13 /acre <br /> d E <br />i <br />t <br />L <br />b <br />t <br />$ 25 / <br /> or an <br />qu <br />pmen <br />cos <br />s <br />a~:re <br />a <br />3. <br />' 4. Equipment to be used Drill and/or Broadcast Seeder <br /> $78.00/acre <br /> D. PLANTING AND TREES: <br />' 46 Acre at 37.i. = 17.250 <br /> E. MAINTENANCE/YEAR/ACRE Labor $ 44.00 _ <br />' Tools $ 8.00 <br /> Fertilizer $ 8.00 <br />' <br /> 60.00 /acr~° 2760 <br /> 46 ac. x TOTAL $ <br />` <br />1 <br />' TOTAL COST CF RECLAMATION FOR OPERATION $ 111,460.00 <br />1 <br /> <br /> 28 <br />