Laserfiche WebLink
<br />ITEM <br />RECLIAM DISTURBED AREA (NO LAKE) <br />ESTIMATED FAILURE RATE 30 <br />FERTILIZER40#IA N8P <br />FERTILIZER APPLICATION <br />DOZER OR LOADER <br />••MAX PUSH 250 FEET•• <br />REPLACING OVERBURDEN <br />use scraper to move. <br />STRIP TOPSOIL 60 ACRES <br />REPLACE TOPSOIL 75 ACRES <br />4000#I ACRE GRASS HAY OR STRAW <br />SPREAD 8 CRIMP MULCH <br />BACK SLOPING (DONE WITH MINING) <br />MOBILIZATION 8 DEMOBILIZATION <br />TOTAL DIRECT RECLAMATION COST <br />INDIRECT COST OVERHEAD 8 PROFIT <br />( PUBLIC LIAB. INSURANCE) <br />(CONTRACTOR PERF. BOND) <br />(CONTRACTOR PROFIT) <br />DMG PROJECT ADMINISTRATION EXP. <br />TOTAL PERFORMANCE BOND AMOUNT <br />COST PER ACRE of the 75 Acres <br />BASED ON 15 ACRES OF LAKE <br /> <br /> EXHIBIT "L" <br />RECLAMATION COST <br />COSTIUNIT UNIT TOTAL UNITS COST I ACRE $/LCY <br />$571.52 ACRE 66.00 $37,720 <br />$571.52 ACRE 17.00 $9,716 <br />SEE ABOVE 0.00 $0 <br />SEE ABOVE 0.00 $0 <br />$396.05 HRS 140.00 $55,447 556605 LCY $0.10 <br />$1,698.39 HRS 304.00 8516,311 695756 LCY $0.74 <br />$283.06 HRS 125 00 $35.383 69163 LCY $0.51 <br />$283.06 HRS 146.00 $41,327 <br />SEE ABOVE ACRE $0 <br />SEE ABOVE ACRE $0 <br />$0.00 ACRE 0.00 $0 <br />$10,272.00 LS 1.00 $10,272 <br /> 5706,175 <br />1550% $10,946 <br />1550% $10,946 <br />10.000% $70,617 <br />------592,509 <br />5.000% 539,934 <br />5938,618 <br />511,182 <br />EVANS PIT # 2 REVISIED <br />