Laserfiche WebLink
PART 11 <br />Page No. to <br />Permit No. COG-650000 <br />A. NOTIFICATION REQUIREMENTS <br />5. Other Notification Remuiremenu (continued) • <br />The permittee's notification of all anticipated noncompliance does not stay any permit condition. <br />All existing manufacturing, commercial, mining, and silviculttual dischargers rtutst notify the Division as soon az they know or have <br />reason to believe: <br />a. That any activity has occurred o:will occur which would result in the discharge, on a routine or frequent bazis, of any toxic pollutant - <br />which is not limited in the permit, if that dischazge will exceed the highest of the following "notif"ication levels": <br />i. One hundred micrograms per liter (100 ugll); <br />ii. Two hundred micrograms per liter (200 ug/1) for acrolein and acrylonitrile; five hundred micrograms per liter (500 ug/1) for 2.4 <br />dinitzophenol and 2-methyl-4.6-dinitrophenol; and one milligram per liter (1 mg(1) for antimony; <br />iii. Five (5) times the n,ax;,n~,.n concentration value reported for that pollutant in the permit application in accordance with Section <br />61.4(2)(8). <br />iv. The level established by the Division in accordance with 40 CFR' 122.44(f). <br />b. That any activity has occurred or will occur which would result in any discharge, on anon-routine or infrequent basis, of a toxic <br />pollutant which is not limited in the permit, if that discharge will exceed the highest of the following "notification levels": <br />i. Five hundred micrograms per liter (500 ug/1); <br />ii. One milligram per liter (1 tng/I) for antimony; and <br />iii. Ten (10) times the maximum concentration value reported for that pollutant in the permit application. • <br />iv. The level established by the Division in accordance with 40 CFR " 122.44(f). <br />6. Bvoass Notification <br />If the permittee knows in advance of the need for a bypass, a notice shall be submitted, at least ten days before the date of the bypass, to <br />the Division The bypass shall be subject to Division approval and limitations imtposed by the Division. Violations of requirements <br />irrtposed by the Division will constitute a violation of this permit. <br />7. Upsets <br />a. Effect of an Upset. <br />An upset constitutes an affirmative defense to an action brought for noncompliance with permit effluent limitations if the <br />requirements of paragraph (b) of this section are met. No determination made during administrative review of claims that <br />noncompliance was caused by upset, and Before an action for noncompliance, is final administrative action subject to judicial review. <br />b. Conditions Necessary for a Demonstration of Upset <br />A permittee who wishes to establish the affirmative defense of upset shall demonstrate through properly signed contemporaneous <br />operating logs, or other relevant evidence that: <br />i. An upset occured and that the permittee can identify the specific cause(s) of the upset; and <br />ii. The permitted facility was at the time being properly operated and maintained; and • <br />iii. The permittee submtted proper notice of the upset az required in Part Il.A.4. of this permit (24-hour notice); and <br />iv. The pemilttee complied with any remedial measure necessary to,,,;.,;,,,;>e or prevent any discharge or sludge use or disposal in <br />violation of this permit, which has a reason able likelihood of adversely affecting human health or the environment. <br />