Laserfiche WebLink
~~ <br />~.2d/G L i5 2ESro.~.tE <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources ~oe~co~o~ . <br />Department of Natural Resources N`Oo <br />1313 Sherman Street, Room 818 ` ~ ` <br />Denver, Colorado 80203 ++ie~b+~ <br />Phone: (303) 866-3581 Response to Reclamation Permit Application Consideration ' <br />FAX: (3031 866-3589 ai(I Owens <br />Governor <br />h«p J/waterstataco.us/defau Ithtm <br />Greg E. Walther <br />Ezeounve Dveaor <br />DATE: August 2, 1999 Hal o. Simpson, P.E. <br />State Engineer <br />TO: Thomas D. Gillis, Senior Environmental Protection Specialist <br />CC: Division 4 Office; District 42 Water Commissioner <br />FROM: Craig M. Lis, P.E. ~~ `~' <br />RE: Operator: Elam Construction, Inc. ,Highway 50 Borrow Area No. 2, File No. M-99-076 <br />Section 32, Twp 2 S, Rng 2 E, Ute P.M., Mesa County <br />Landowner- <br />CONDITIONS FOR APPROVAL <br />The proposed operanon does not anticipate exposing groundwater. Therefore, exposure of ground water must <br />not occur during or after mining operations. ~ <br />The roposed operation will consume ground water by ~/ evaporation, -dust control, -reclamation, <br />water removed in the mined product, _~rocessing, -other: <br />. Prior to initiation of these uses of <br />ground water, the applicant will need to obtain either a gravel pit or other type of well permit, as applicable. <br />Prior to obtaining a permit, an approved water supply plan or decreed plan for augmentation is required. <br />Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit azea. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notification/hearing process. <br />The proposed operation may have potential impact on existing water rights neaz the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />The applicant has indicated plans to use other water for:_uses at the permit site, -storage in the <br />excavated azea(s), The applicant will need to provide evidence to this office that the water is pemtitted or <br />decreed for such uses. <br />Other: <br />COMMENTS <br />