Laserfiche WebLink
1 . <br />' 3. <br />4 Grading and scarifying the subsoil. <br />Di <br />ib <br />i <br />f <br />f <br />il <br />h <br />d <br />d <br /> . ut <br />str <br />ng one- <br />oot o <br />topso <br />over t <br />e gra <br />e <br /> and scarified fill material. <br />' S. Grading and scarifying the topsoil. <br /> 6. Distributing the manure over the entire area. <br /> Reclamat ion requirements include: <br />' 1. Coverage of all coal waste with a minimum of four <br /> feet of fill. <br />' 2. Contouring of final terrace slope will be less than <br /> 20:I (horizontal to vertical) and the outslope will <br />' be less than 2:1 (horizontal to vertical). <br /> 3. Distribution of all stockpiled subsoil material and <br /> topsoil. <br />' 4. Distribution of manure over the entire area. <br /> 5. Completion of all work within one year after the <br />' landfill has reached its capacity. <br />' CALCULAT ION BASIS <br /> Major ea rthmoving equipment includes: <br />' Cat erpillar D-7H and/or D-9H dozer and scraper: <br /> -Fill Placement <br /> -Slope Contouring <br />' -Topsoil Placement <br />t Caterpillar front-end loader and manure spreader: <br />-Manure hauling and placement <br />' Miscellaneous support equipment: <br />-Water trucks <br />' -Cube truck <br />-Pickups <br />Page 14 <br />' COSTING BASIS <br />Earthmoving cost was determined by bids based upon cubic yards of material <br />' handled, $1.00/cu. yd.) plus 15% for labor ($1.15/cu. yd.). <br />