Laserfiche WebLink
<br />TABLE 3.1-15 (cont'd) <br />RECLAMATION COST CALCULATIONS <br /> ESTIMATED TIME <br />EQUIPMENT AVERAGE OPERATING PRODUCTION ESTIMATE TOTAL <br />PROJECT/YARDAGE USED PUSH/HAUL ASSUMPTIONS YD3/HR HOUR COST/HOUR COST <br />REFUSE DISPOSAL AREA (PHASE IV) <br />Recontour Roads <br />6,200 yd3 D-8 50 1,2,3 860 7 134 938 <br />Topsoil Refuse Area <br />80,000 yd3 Cat 613B 1,500 1,2,3 110 727 76 55,252 <br />Topsoil Sediment Pon <br />3,200 yd Cat 613B 500 1,2,3 170 19 76 1,444 <br />Recontour Sediment <br />Pond 3,200 yd3 D-8 75 1,2,3 800 4 134 536 <br />Topsoil Roads 3,200 yd3 Cat 613B 640. 1,2,3,4 145 22 76 1,672 <br />REFUSE DISPOSAL AREA ACCESS ROAD <br />Recontour Road <br />24,000 yd3 D-8 50 1,2,3 860 28 134 3,752 <br />Topsoil Road <br />14,400 yd3 Cat 613B 4,500 1,2,3,4 67 216 76 16,416 <br />SLURRY PONDS <br />Liner Removal - Haul to <br />RDA 4,700 yd3 Cat 613B 6,700 1,2,3 50 94 76 7,144 <br />Cat push time D-8 200 .1,2,3 440 11 134 1,474 <br />Backfill <br />Cat push time 4,700 yd3 D-8 150 1,2,3 590 34 134 4,556 <br />Embankment 5,400 yd3 D-8 650 1,2,3 145 37 76 2,812 <br />Topsoil Slurry Pond$ <br />9,000 yd Cat 613B 2,000 1,2,3,4 110 82 76 6,232 <br />rn ~ <br />r <br />F, <br />`° r.: <br />W <br /> <br />