Laserfiche WebLink
<br />• <br />TOPSOIL SALVAGE <br />DISTIRBUTION AND STORAGE OF TOPSOIL <br />Topsoil salvaged will be stored in one of three stockpiles shown below. Also <br />shown are the locations from which each stockpile will receive topsoil. <br />VOLUME PREVIOUS TOTAL <br />STOCKPILE THIS PERMIT VOLUME VOLUME LOCATION <br />Central 133,029 0 133,029 Central Area - McClave <br />Refuse Area <br />Munger Road <br />35,324 0 <br />2~ 4~ 3 6.,830 Yd.' <br />and Refuse Roads <br />74,424 Refuse Area and Part <br />of Refuse Road <br />9,070 Munger Road and Conveyor <br />Topsoil will be redistributed evenly over the disturbance at a depth of 18 inches. <br />n <br />U <br />