Laserfiche WebLink
Page 6 <br /> <br /> <br />TABLE 3.1-iS (cont'd) <br />RECLAMATION COSTS CALCULATIONS <br />BUILDING OR FACILITY <br />AREA <br />Office - Wood frame ii~- ~~'h 6,000= ~,'~~-- <br />Shop - Metal frame ~ ~s~^ 3,200= 6,Zyo <br />Warehouse - Metal frame /S~ti 5,400= <br />Bathhouse - Metal frame ~ i5n16,000=~>>'--~ ~ <br />Wash Plant - Modular metal 6,750 <br />Bulk Rock Dust Bin - metal <br />Truck Scales - Modular metal <br />Guard House - Modular metal <br />Rotary Breaker - Modular metal <br />Conveyor Removal - Modular metal <br />McClane to Central <br />Munger to Central <br />Central Area <br />Load-out Structure <br />Reclaim Tunnels - Pre-cast concrete <br />Stacking Tube - Modular metal <br />Pump House - Concrete Block <br />Water Treatment Plant - Concrete <br />Water Tanks at Mine <br />Fuel and Lube Tanks @ CFA <br />c'~ 100 <br />600 (double) <br />@ $1.00/lft. <br />5,100 <br />8,000 <br />1,780 <br />640 @ 5.00 <br />400 <br />2@ 1,000 <br />6@ 1,000 <br />ESTIMATED COST <br />(2.25/ft2) <br />13,500 <br />7,200 <br />12,150 <br />36,000 <br />15,200 <br />500 <br />500 <br />225 <br />2,700 <br />5,100 <br />8,000 <br />1,780 <br />1,000 <br />3,200 <br />1,000 <br />900 <br />2,000 <br />6,000 <br />116,955 <br /> <br />