My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132792
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:32 PM
Creation date
11/26/2007 12:28:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997027
IBM Index Class Name
Permit File
Doc Date
6/16/1997
Doc Name
MOONSCAPE PIT FN M-97-027 RESPONSE OF TECHNICAL ADEQUACY REVIEW
From
ENVIRONMENTAL & RESOURCE PERMITTING
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Amendment #1 <br />Exhibit C -Mining Plan <br />A. Dates; <br />No changes <br />B. Soil Science Data; <br />No Changes <br />C. Disposition of Overburden; <br />No Changes <br />D. Thickness of Deposit; <br />C~ENVER <br />OFFICE <br />RF(;FI\IFfI <br />>JUIV 1(z 1997. <br />~i~~„~,. _ .....,,,~a~s & Geoloyy <br />Re~~ <br />~~"r ~ <br />5 ~g9r <br />n <br />0; . ' <br />. _, Gea/~, <br />The deposit to be mined varies from 6 to 25 ft in depth. At this time the site has not been drilled <br />to ascertain the actual depth of the deposit it has been estimated at 15ft. The shallow case of <br />mining only Eft has been set if the deposit turns out to be unfavorable and adequate depth and <br />quantity of materials are not found. However the pit will be excavated to the contact with the <br />underling shale deposit. Additional excavation of this shale deposit may occur providing the <br />economic conditions permit. Therefore under the favorable conditions that the shale proves to be <br />a saleable commodity, the pit could be mined as much as l Oft into the shale, thus giving rise to the <br />25ft depth. Mining will occur in a uniform manner lowering the pit floor to maintain an uniform <br />slope of less than 2% across the pit. <br />E. Major Components of Operation; <br />The only major component of the operation is the pit. No structures are contemplated. <br />Processing equipment utilized in the pit will be portable. Due to the small nature on the pit site it <br />is not possible to determine a fixed position for portable Crushing and Screening or Asphalt <br />Production equipment. Equipment will be located by the equipment owner/operator upon <br />arriving on site. In most cases the operator will position the processing equipment near the <br />working face of the pit and/or existing stockpiles. Stockpiles will be located within the permit <br />boundary and will vary in location as best benefits the owner and the processing operator. The <br />access road is existing and will remain after mining. <br />r- <br />JUN 0 51g~ <br />Ihrr2n~o Field Office <br />D'v`•Sicn ~; '.',-;,,-ai; g Geology <br />
The URL can be used to link to this page
Your browser does not support the video tag.