• <br />YUST RANCH GRAVEL PIT <br />EXHIBIT "D" <br />RECLAMATION PLAN <br />Yust Ranch Reclamation Plan is to follow the three different <br />mining phases with reclamation. Three to one back sloping of the Pit <br />wall will be done as mining is moving forward and at a point where <br />enough back sloping is done topsoil will be placed a minimum of 4" to <br />6" deep and drill seeding done following Soil Conservation Service <br />Plan (see attached plan) <br />Overburden and Topsoil is stockpiled on both sides of pit area <br />making the shortest push with dozer when applying topsoil. Future <br />use of the land is for rangeland. <br />Topsoil and seeding of mining phases in the area will be done <br />every year or two years depending on how much gravel is removed. <br />The gravel market varies from year to year. <br />Complete topsoiling of the floor area will have to be done after <br />the equipment is moved out. <br />Yust Ranch plans to follow the Soil Conservation Service plan, <br />which is attached. <br />Reclamation costs will be minimal at the Yust Ranch Gravel Pit <br />due to the mining plan. <br />Maximum disturbance will be at the end of phase one of three <br />phases of mining. <br />Reclamation costs will be for Topsoil and seeding as all the <br />backfilling, resloping, and grading is being done while mining is taking <br />place. <br />