My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132706
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:28 PM
Creation date
11/26/2007 12:24:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000014
IBM Index Class Name
Permit File
Doc Date
1/27/2000
Doc Name
Application Exhibits
From
Yust Ranch
To
DMG
Section_Exhibit Name
Application Exhibits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />YUST RANCH GRAVEL PIT <br />EXHIBIT "C" <br />MINING PLAN <br />RECEIVED <br />JAN 2 7 2000 <br />DiVlSion Of Mmerars ~ ~eoiogy <br />Yust Ranch Gravel Pit is expected to be open June 1 2000, and <br />be able to be mined for 20 years June 1 2020. <br />Topsoil will be stripped 4" to 6" and stockpiled on the North and <br />South side of the pit for use of reclamation. The stockpiles will be <br />seeded to prevent erosion as described in Soil Conservation Report. <br />The removal of gravel from the permitted area will begin in <br />phase 1, at the West end and move to the East into the other phases <br />as time goes on. Reclamation will follow closely behind the different <br />phases as recommended in the Soil conservation service Report. <br />Approximately 15' of material will be removed from this dry <br />alluvial gravel deposit and then sloped back and covered with topsoil <br />as recommended in the Soil Conservation Service Report. <br />Equipment in the permitted area will be crushers, conveyors, <br />screens, and future wash plant and concrete batch plant. Some <br />equipment will be moved in and out of the pit as the working season <br />begins and ends. <br />Front-end loaders and cats will be used to handle the material <br />as it is processed and hauled away. <br />Approximately 20,000 - 30,000 tons of material will be removed <br />every year. <br />Overburden if encountered will be placed directly on the North <br />or South slope where the gravel has already been removed to start <br />the 3 to 1 slopes. <br />Stockpile of finished product will consist of 2-3 piles each pile <br />taking up 4500 square feet. <br />There is an existing 20' gravel road to and thru the pit and this <br />will be the only road necessary for the gravel pit operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.