Laserfiche WebLink
• <br />Project Title <br />Watershed Data for Watershed <br />Curve Number <br />Area <br />Hydraulic Length <br />Elevation Change <br />Concentration Time <br />Concentration Time Type <br />Unit Hydrograph Type <br />Watershed Data for Watershed <br />Curve Number <br />Area <br />Hydraulic Length <br />Elevation Change <br />Concentration Time <br />Concentration Time Type <br />Unit Hydrograph Type <br />Watershed Data for Watershed <br />• Curve Number <br />Area <br />Hydraulic Length <br />Elevation Change <br />Concentration Time <br />Concentration Time Type <br />Unit Hydrograph Type <br />Watershed Data for Watershed <br />Curve Number <br />Area <br />Hydraulic Length <br />Elevation Change <br />Concentration Time <br />Concentration Time Type <br />Unit Hydrograph Type <br />• <br />POND B <br />= Pond B Peak Flow Calculations <br /># B-1 Disturbed <br />= 87.6 <br />= 40.0 acres <br />= 5115 feet <br />= 1020 feet <br />= 0.76 hours <br />= SCS Upland Curves <br />= Disturbed <br /># B-2 Mixed Shrub <br />= 41 <br />= 56.7 acres <br />= 5325 feet <br />= 1800 feet <br />= 0.47 hours <br />= SCS Upland Curves <br />= Forested <br /># B-3 Dry Mixed Shrub <br />= 57.0 <br />= 17.6 acres <br />= 3370 feet <br />= 1150 feet <br />= 0.38 hours <br />= SCS Upland Curves <br />= Forested <br /># B-4 Juniper Woodland <br />= 61.0 <br />= 30.5 acres <br />= 2100 feet <br />400 feet <br />= 0.27 hours <br />= SCS Upland Curves <br />= Forested <br />PR-03 EXh-8 - 21 - Si99 <br />