Laserfiche WebLink
RECLAMATION COST ESTIMATES <br />• 2 HEST PORTALS <br />ITEM UAQ NTITY UNIT UNIT COST TOTAL COST <br />Removal of Structures <br />Power Line 10,100 ft 1.72 17,372 <br />Culverts (5) 8 hr 115.00 920 <br />Substation - Concrete 30x30 sgft 3.80 3,420 <br />- Structure 20x30x8 tuft 0.20 960 <br />- Fence 160' lnft 1.04 166 <br />Compressor - Concrete 10x20 sgft 3.80 760 <br />- Structure 1Ox20x8 tuft 0.20 320 <br />- Fence 80' lnft 1.04 83 <br />Portal Structure (2) 2x18x7x10 tuft 0.20 504 <br />Seal Portals <br />Seals (2) 2 each 3000.00 6,000 <br />Earth Work-North Portal 550 cuyd 1.65 908 <br />-South Portal 350 cuyd 1.65 558 <br />-Substation 400 :cuyd 1.65 660 <br />-Access Road <br />• N/A <br />Revegetation <br />- Seed & Fertilizer <br />5.2 <br />acre <br />425.00 <br />2,210 <br />- Seeding (drill) 5.2 acre 90.00 468 <br />- Mulch 5.2 acre 200.00 1,040 <br />TOTAL RECLAMATION COST <br />36,369 <br />• <br />(Revised 11-16-92) <br />TR-l4 <br />