Laserfiche WebLink
POWDERHORN COAL COMPANY <br />• ROADSIDE MINE SOUTH FAN LOCATION <br /> TABLE 2 <br /> RECLAMATION PLAN COST ESTIMATE <br /> UNIT <br /> ITEM UAQ NTITY UNIT COST COST <br /> Removal of Structures <br /> Labor ~ 16 Man/Hr S 17.20 $ 275 <br /> Equipment 16 Hr. 29.30 464 <br /> Earthwork <br /> Fi17 1600 Cu-Yd 1.50 2400 <br /> Fill Shaft 600 Cu-Yd 2.50 1500 <br /> <br />i Spreading Topsoil 300 Cu-Yd 1.25 375 <br /> Material (Concrete) 8 Cu-Yd 60.00 480 <br /> Drill Seed 1.7 Acre 40.00 68 <br /> Mulching 1.7 Acre 175.00 298 <br /> Fertilizer 1.1 Acre 375.00 638 <br /> Seed 1.7 Acre 64.00 709 <br /> TOTAL $6,612 <br />• <br /> TR-01 March 18, 1983 <br />