Laserfiche WebLink
<br />Another alternative would be to install a Laramie-Fox Hills well. <br />Since the property is in a designated groundwater basin, the permit <br />will need the approval of the management district. Normally the <br />management districts accept the SEO criteria for allowable yield <br />from a well. The SEO maps show the top of the L-FH at the site <br />to be at elevation 467$ feet, the base at elevation 4350 feet, <br />and the saturaded thickness to be 175 feet of sandstone and silt- <br />stone. Using a specific yield of .15, water available to the <br />320 acres from the L-FH is <br />320 acres x .15 x 175' - 84 acre-feet per year. <br />100 years <br />This should be more than sufficient for the needs of the opera- <br />tion. <br />If you have any questions or need additional information, please <br />let me know. <br />9 4 0 5 ~EG~~~ °Z ~~~- <br />4 <br />?' <br />;.~oN.~c.;~;;~~,T~Zdith L. Hamilton, P.E. <br />