Laserfiche WebLink
TABLE 2.05.3-3 <br />ANNUAL MINING OPERATIONS STATISTICS <br />NEW HORIZON MINE, MONTROSE COUNTY, COLORADO <br /> ACRES CU. YDS VIRGIN <br />YEAR MINED TONS OB/PART RATIO <br />2002 30.0 375,500 3,864,100 10.29 <br />2003 31.1 375,100 4,458,300 11.89 <br />2004 29.6 375,200 4,162,500 11.09 <br />2005 28.5 375,000 3,683,500 9.82 <br />2006 28.8 375,200 3,450,000 9.20 <br />2007 28.7 375,800 3,378,200 8.99 <br />2008 30.6 375,600 3,294,900 8.77 <br />2009 37.2 375,200 3,392,400 9.04 <br />2010 23.2 233,900 918,900 3.93 <br />• <br />• (Revised 9/2002) 2.05.3-6 <br />