• SECTION 2.05.2 <br />OPERATION PLAN: Estimated Area for Life of Mine <br />Introduction <br />This section describes the mining plan which is to be used from 1999-2010. The mining methods, <br />including overburden and coal removal, coal supply agreement, and mining equipment are <br />described. <br />Mining Methods and Equipment <br />Mining at New Horizon 2 will follow the pattern shown in Map 2.05.3-1. No overburden removal or <br />coal mining will take place at the New Horizon 1 area; however, reclamation will continue to be <br />carried out at New Horizon 1. <br />Mining activities began in early 1993. Excavation was performed by dozers, trucks and one shovel. <br />This same mining method and equipment selection will continue to be used. The anticipated mining <br />schedule for each area where mining will occur is graphically shown on Map 2.05.3-1. Overburden <br />• will be removed by a shovel and truck fleet and/or dozers after an area has been drilled and shot. <br />The primary coal seam to be recovered is the Lower Dakota seam; however, the Upper Dakota <br />seam will be recovered if it is thick enough and of sufficient quality. Maximum overburden depth <br />will approach 110 feet. Mining cuts will have a generally north-south orientation and will progress <br />westward except for the area north of BB Road and east of 2700 Road, which will have an east- <br />west orientation. <br />Mining was begun along the eastern subcrop of the New Horizon 2 area and a panel mining method <br />was used to develop the pits (see Map 2.05.3-1 ). The panels will vary in length and width <br />according to conditions. Panel lengths will approach 2400 feet long and panel width will vary from <br />120-260 feet. Mining will generally progress east to west with the long axis of the pits generally <br />north to south. The overburden will be excavated using dozers and a shovel and truck fleet. The <br />overburden will be placed or pushed into an adjacent or nearby mined out pit panel except the initial <br />cut which will be placed adjacent to the pit onto land designated as a temporary overburden <br />stockpile (see Map 2.05.3-1 ). Topsoil stockpiles are also shown on this map. <br />• (REVISED 10/2002) 2.05.3 - 1 <br />