My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132653
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:25 PM
Creation date
11/26/2007 12:22:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
APPENDIX 9 RECLAMATION INFORMATION
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Mi rorels and Geology <br />• <br />ESTIMATING FORM - BULLDOZER VORK <br />Task ar: 18 Prep. by: XBR <br />Date: 01/18/95 Permit M:C-81-035 <br />Permit Action: Midterm <br />Task Description: Pond removal - <br />Task Ftle Name: C035-18 <br />Mine: King Coal <br />XOURLY EDUIPMENT COST <br />___ _________________ Basic Machine: Cat D8M Horsepower: 285 <br />Blade Type: Universal <br />Attachment K1: RODS Cab Shift Basis: 1/day <br />A [tecMaent C2: N/A <br />Cost Breakdown: <br /> Uti li zetian X (code bi0) <br /> Ownership cost/hr = (40.42 N/A <br /> Operating d overhaul cost/hr- dozer = f40.63 100 <br /> -ripper = f0.00 M/A <br /> Operator cost/hr = (21.58 N/A <br /> Total egpt. unit cost/hr = (102.63 Total fleet cost/h r: f102.63 <br /> MATERIAL WANTITIES <br />___________________ <br /> ___________________ <br />Initial <br />Swell <br />Loose <br />• Volume: 3,227.0 BCT Factor: 1.250 Volume: -- 4,033.8- LCT <br /> Source of quantity take-oft: Appendix 9 <br />Y <br /> Source of est. swell factor: same <br /> HOURLY PRODUCTION <br /> _________________ Job Condi[i on Correction Factors <br /> Avg. push distance: 75 ft. ------------------ ------- <br /> --- Operator.......... 0.75 (avg.) <br /> Unadjusted hourly Mat. consistency.. 0.90 (Cat tbl) <br /> dozer production: 1177 LCY/hr Dozing method..... 1.00 (gen.) <br /> Visibility........ 1.00 (avg.) <br /> Material coreistency: Job efficiency.... 0.83 (tsh/day) <br /> Conpacied fill or enbankment Transmission type. 1.00 ( PS ) <br /> dj <br />t <br />t <br />G <br />d 1 <br />00 t tbl) <br />(C <br /> ra <br />e a <br />us <br />men <br />.. . a <br /> Avg. posh gradient: 0.00 X (pos) Altitude adj. .... 1.00 (Cat tbl) <br /> - Materiel weight... 1.00 (Cat tbl) <br /> Avg. site altitude: 7500 ft. Blade type........ 1.00 (S or U) <br /> Material weight 2300.00 Lb/LCY Net Job Correction :- 0.56 <br /> Ma [. Desc r.: - <br /> GENERAL FILL Adjusted Unit Prod.: 659.26 LCT/hr <br /> Adjusted Fleet Production: 659.26 LCY/hr <br /> JOB COST -- <br /> Fleet sire 1 Dozers) Total Job Time: 6.12 Hours <br />• Unit Cost (0.156 /LCY Tota( Job Cost: (627.92 <br />June 199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.