Laserfiche WebLink
• <br />• <br />• <br />ESTIMATING FORM - TRUCK/LOAOER TEAMS <br />Colorado Dlviai on o} Nlnere is erd Geology <br />Sheet 7 of 3 <br />Tesk No. 15 Prep. By: NBR Permit No. C-80-035 <br />Date 01/18/95 Filenmie: C035-15 Operation: Kira Coal <br />Permit Aetion Midterm <br />Tesk Description Neul fill to new portals <br />NOURLT EDUIPMEMT COSTS: <br />__~____________-__= Single, Double or T riple <br />County: LA PLATA Labor Zone 1 Shifts S <br /> Equipment Descripti ons <br />T ruck/load tam - Truck :Generic 18t, 12.0-1 8.Ocy, 350hp 6x4 d. on/off-hw <br />- Loader :GT 916 <br />Support equip. - Loed erea :N/A <br />- Dusp erea :N/A <br />Road eai nt. - Oreder :N/A <br />- Yeter T. :N/A <br />Truck/ LOed Teem Support Equipment Road Maintenarce <br />Truck Loader Load area Dump area Grader Yater T. <br />Equipment Fileneoe:lBCTNLTK 916-LOOR N/A N/A M/A N/A <br />Uti fixation m job <br />-Machine: 91X 100X N/A N/A M/A N/A <br />-Ripper N/A M/A M/A N/A M/A M/A <br />Cost Breakdown <br />Ownership cost/hr: 523.03 512.87 N/A N/A N/A N/A <br />Operatirp cost/hr: 519.27 512.26 N/A N/A M/A M/A <br />Ripper Op. cost/hr: 50.00 50.00 N/A M/A N/A N/A <br />Operator cost/hr: 521.40 520.08 N/A N/A N/A N/A <br />Unit subtotals 563.70 f45.20 N/A N/A N/A N/A <br />/ of eop. units 2 1 0 0 0 0 <br />Group subtotals- T/L teem: S1 Tt.bt Support: f0.00 Rd. Ma int .: f0.00 <br />Total York Teem Cost/Xr 5172.61 <br />MATERIAL gUAMTITIES: <br />Beg. <br />Yolume: 3,500 LCT <br />[u.Td. Swell <br />Volume: 3,500 LCT Factor: N/A <br />Source of quantity take-off:Permit, Bond Est imete <br />Loose <br />Volume: 3,500 LLY <br />Source of est. swell factor:ne <br />June 1995 <br /> <br />