Laserfiche WebLink
xouRLr PROOUCr)aM: <br /> ----__~____ <br />' ~ Job Condition Correct ton Factors <br />• scraper Cycle iiae ~ _ <br />Site elti~~de <br />7500 it. <br /> = <br />Load 1.2 min. <br /> Alt. adjustment .. 1 <br /> Maneuver i spread • 0.7 min. ~ Job of tf ciercy ... 0.83 (1sh/d) <br /> Travel time (haul i return): ~ Met Correction 0.83 <br /> xsul route <br /> Raed Lergth Grade Rolling Totai Velocity Trevei times <br /> seg. 1 (it) res.(X) res.(X) res.(X) (fpo) (min) <br /> 1 700 -74.00 4.00 -70.00 1595 0.62 <br />Return route <br />Xaul time = 0.62 min. <br />7 700 14.00 4.00 18.00 827 1.02 <br />• <br />•1ct i last seg. adj. for octal./decal. Re[urn time = 1.02 min. <br />Total Lytle Tice = 3.54 min. <br />+ Machine Volume <br />Machine Payload ~ - <br /> Struck capacity = 14.00 <br />Materiel weight =2300.00 lbs/LLY ~ Xeaped capacity = 20.00 <br />Mat. description ~ -- --------- <br />GENERAL FILL ~ Average = 17.00 LCT <br />Rated payload 48,000 lbs. ~ Adjusted volume = 17.00 LCT <br />Payload volume = 20.87 LCY <br />Unadjusted production per scraper or push-pull pair 288.27 LCY/hr <br />Adjusted production 239.26 LCT/hr <br />Adjusted hourly fleet production 478.52 LLY/hr <br />JOB COST: <br />Fleet size 2 Scraper(s) total Job Time: 10.03 xours <br />• Uni[ Cost f0.475 /LCT Total Job Cost: f2, 279 <br />J1Jne 1995 <br />6 <br />