Laserfiche WebLink
J <br />• <br />r 1 <br />L_J <br />Colorado Di vi cion of Nineralc and Geology <br />ESTIMATING FORM - BULLD02ER YORK <br />Task /: 10 Prep. by: NBR Tesk Flle Mama: [035-10 <br />Date: 01/18/95 Pertsit aC:C-81-035 Mine: Kira Coel <br />Permit Action: Midterm <br />Task Descri ptlan: Grade topsoil at feciLi ti es area <br />XOWILT EDUIPNEN7 COST <br />Basic Machine: Cat D8N <br />Blade Type: Universal <br />Attachnmt g1: ROPS Cab <br />Attechmmt C2: N/A <br />Horsepower: 285 <br />Shift Basis: 1/day <br />Cost Breakdown: <br /> Uti llzetlon X. (code Otu) <br />Owrxrship cost/hr = 540.42 N/A <br />Operating i overhaul cost/hr- dozer = 540.63 100 <br />-ripper = 50.00 N/A <br />Operator cost/hr 521.58 N/A <br />Total eft. rni[ cost/hr = 5102.63 Total fleet cost/hr: 5102.63 <br />MATERIAL OUANTIT [ES <br />___________________ <br />Initial Swell <br />Loose <br />Volume: 7,L00.0 LCY Factor: N/A Vol une: 7,400.0 LCY <br />Scarce of quantity take-off: Apperd~nc 9 <br />Source of est. swell factor: na <br />XpIRLT PRODUCTION <br />__=__________= Jab Condition Correction Factors <br />h di <br />100 f <br />A <br />t <br />vg. pus <br />ance; <br />s <br />t. <br />- Operator.......... 0.75 [avg.) <br />Lhadj usted hourly Mat. corm stency.. 1.20 (Cat tbl) <br />dozer productim: 964 LCT/hr Dozirg method..... 1.00 (gm.) <br /> Visibility........ 1.00 (evg-) <br />Materiel coreistency: Jab efficiency.... 0.83 (1sh/day) <br />Loose stockpile Trerumisci on type. 1.00 ( PS ) <br /> d <br />d <br />t <br />G 1 <br />60 (C <br />t tbl) <br /> ra <br />e a <br />justmen <br />.. . <br />a <br />Avg. push gradi mt: 30.00 X (reg) Altitude adj. .... 1.00 (Cat tbl) <br /> Material weight... 1.00 ([at tbl) <br />Avg. cite altitude: 7500 ft. Blade type........ 1.00 (S or U) <br />Material weight 2300.00 Ib/LCT Net Job Correction 1.20 <br />Mat. Destr.: <br />GENERAL fILL Adjusted Unit Prod.: 1152.45 LCT/hr <br />Adjusted Fleet Producti m: 1152.45 LCY/hr <br />JOB COST <br />Fleet size 1 Dozers) Total Job Time: 6.42 Hours <br />Unit Cost f0.069 /LCT Total Job Cost: 5658.97 <br />June 1995 <br /> <br />