Laserfiche WebLink
NOURLT PRODUCTION: <br />""""'~_____ ~ Job Condition torreetton Fedora <br />Sereper Cycle Time <br />• Site altitude = 7500 ft. <br />Load 1.2 min. <br /> Alt. adjustment .. 1 <br />Maneuver i agreed = 0.7 min. ~ Job efficiency ... 0.83 (fah/d> <br />Travel [iae (haul E return): ~ Net Correction 0.83 <br />Naul route <br />Road Length Grade Rolling Total Yelocity Travel [ime• <br />seg• i (f t) res.(X) res.(X) res.(X) (fpu) (min) <br />1 700 -14.00 4.00 -10.00 7595 0.62 <br />Return route <br />Naul time = 0.62 min. <br />1 700 14.00 4.00 18.00 827 1.02 <br />r ~ <br />L J <br />•1st i Last beg. adj. for octal./dace L. Return time = '1.02 min. <br />ToteL Cycle Time = 3.54 min. <br /> Machine Volume <br />Mxhine PeY Load <br /> Struck capacity = 14.00 <br />Material weight =2300.00 lbs/LCT ~ Xeaped capacity = 20.00 <br />Met. descri pt ion ~ -- --------- <br />GENERAL FILL ~ Average = 17.00 LCY <br />Rated peyl oed = L8,000 lbs. ~ Adjusted volume = 17.00 LCY <br />Payload volume = 20.87 LCY <br />llredj usted production per scraper or push-pull pair 288.27 LCT/hr <br />Adjusted production 239.26 lCY/hr <br />Adjusted hourly fleet production 478.52 LCY/hr <br />JOB COST: <br />Fleet size 2 Scraper(s) Total Job Tine: 30.30 Nouns <br />• Unit Cost f0.475 /LCT Total Job Cost: 56,883 <br />June 1995 <br />t <br />