My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132653
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:25 PM
Creation date
11/26/2007 12:22:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
APPENDIX 9 RECLAMATION INFORMATION
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOURLY PRODUCTION: <br />•••_____•____•_•_ ~ Job Condition Correction Fectora <br />• Scraper Cycle Time <br />Site altitude = 7500 ft. <br />Land = 1.2 min. <br />--- ~ Alt. adjustment .. 1 <br />Maneuver d spread = 0.7 min. ~ Job efficiency ... 0.83 (1sh/d) <br />__~__ I ..._____._. <br />Travel time (haul 8 return): ~ Net Correction 0.83 <br />- <br />Xaul route <br />Road Leng[h Grade Rolling Total Velocity Travel times <br />aeg. Y (ft) res.(X) res.(X) rec.(X) (ipa) (nin) <br />1 1500 -10.00 4.00 --6.00 29114 0.76 <br />Haul time = <br />• <br />I <br />Return route <br />1 1500 10.00 4.00 14.00 1114 <br />*1st 8 lest seg. adj. for octal./decal. <br />Total CYCIe lime = 4.20 min. <br />__ <br />Machine Payload <br />Material Neigh[ =2300.00 lbs/LCY <br />Mat. description --- <br />GENERAL F[LL <br />~~_____ i <br />Return time = <br />0.76 min. <br />1.54 <br />1.54 min. <br />Machine Yol une <br />Struck capacity = 74.00 <br />Neaped capacity = 20.00 <br />Average = 17.00 LCY <br />i <br />Rated payload = 48,000 lbs. ~ Adjusted volume = <br />17.00 LCY <br />-- ~ <br />Deylaad volume = 20.87 LCY - <br />Unedj usted production per scraper or push-pull pair 242.62 LCY/hr <br />Adjusted productim 201.38 LCY/hr <br />Adjusted hourly fleet production 402.75 LCY/hr <br />JOB COST: <br />Fleet sire 2 Scraper(s) To[al Job Time: 78.62 Nouns <br />Unit Lost 50.564 /LCY Total Job Cost: 54,230 <br />JLme 199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.