My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132627
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:24 PM
Creation date
11/26/2007 12:21:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998103
IBM Index Class Name
Permit File
Doc Date
2/8/1999
Doc Name
CONSTRUCTION MATERIAL LIMITED IMPACT 110 OPERATION RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT "C" <br />MINING PLAN ~ . <br />b <br />(a) Mining Dates 1 qi v la 4f~e,~~ft ~"~ <br />Unfortunately, mining started in 1998 before a pennit was issued, It will continue after the permit <br />is issued until the material is exhausted -probably Fall of 2020, or sooner. This will be a <br />compazatively low volume operation due to the quality of the material, which is only suitable for <br />non-specification road base. <br />(b) Topsoil -soil suitable as a plant growth medium. <br />7.y °`.c. <br />It appears that (the Sandy Loam) topsoil ranges from 5" to 12". It will be stripped and stockpiled <br />on the pit perimeters for use in reclamation. If stockpiles remain in place for more than one growing <br />season, they will be seeded with an SCS recommended seed mix. Generally this is 7 /# A pls of ~'r <br />Western Wheatgrass. \- - ~~ 4 <br />(c) Thickness of overburden or quantity of waste rock. <br />The subsoil is sandy clay loam which in some instances might be called overburden. However, in <br />this instance, the clayey material is mixed with the sand below to aid in compaction. _ ~z ~,~ ; / <br />(d) Thickness of deposit to be mined. <br />It appeazs that the deposit will average about 15 feet in thickness. <br />(e) Major components of the mining operation. <br />i. Access is directly north off of Highway 24 into the owner's property. <br />The pit azea will encompass 9.37 A, and the haul road 0.47 A. <br />3. No office, shop or maintenance buildings are present on site or proposed. <br />ps ~P ~ Ct ~`~' <br />~- .,:. <br />4. Since this is an open-pit operation, there will be no underground openings such as adits or <br />ventilation facilities connected with this operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.