My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132527
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:16 PM
Creation date
11/26/2007 12:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977573
IBM Index Class Name
Permit File
Doc Date
12/29/1977
Doc Name
REGULAR 112 PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • EXHIBI~E (Cont'd) <br />Therefore, if the primary plan for reclamation can be carried <br />' to completion the total water surface in the four lakes will <br />be approximately 89.72 acres +, If the alternate plan in <br />' Area 2 becomes necessary, the water surface in the five lakes <br />will be approximately 119.01 acres +, The operator anticipates <br />that the revegetation plan and the use of tree screens at the <br />lakes will create a desirable habitat for various species of <br />wildlife. <br />' The operator intends to plant the grasses recommended by <br />the U. S. Soil Conservation Service described in the report <br />' included in Exhibit I/J (see Revegetation Program in this <br />Exhibit E). It appears unlikely at this time that supplemental <br />water for sprinkling the grass during the first 6-8 weeks <br />' after planting will be available, but should water become <br />available it will be used as recommended. <br />' The property will be mined in nine stages, each five years <br />in duration except for the last stage which will last four years. <br />' At the conclusion of each mining stage a reclamation phase will <br />' be commenced. Valco plans to attempt to complete grading, <br />reshaping, seeding, mulching and fertilizing within one year <br />' of the completion of each mining stage. <br />The usual planting, mulching and fertilizing time will be <br />' from April 1 to n4ay 15 of each revegetation year. During the <br />' four remaining years of a reclamation phase the reclamation <br />progress will be monitored and remedial work will be performed <br />' where necessary. <br />1 <br />' 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.