Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />• <br />EXH~T D (Cont'd) <br />contain less than 72,000 tons, and there are perimeter areas <br />in each stage which will not be mined. An estimated mining <br />timetable is shown below. Comparison of the timetable with <br />map Exhibit D-1 will show where the operation began, where it <br />is going and an estimate of how long it will take. <br />Estimated Mining Timetable <br />?,fining Total Average Annual <br />S tage Years Acres ± Tonnage <br />0 July 1, 1973-1977 19.78 -- <br />I 1978-1982 25.61 213,036 <br />II 1983-1987 29.47 225,012 <br />III pt.l 1988-1992 9.76 224,844 <br />III pt.2 1988-1992 10.98 224,844 <br />IV pt.l 1993-1997 3.44 224,932 <br />IV pt.2 1993-1997 18.73 224,932 <br />V 1998-2002 14.33 224,922 <br />VI 2003-2007 13.26 225,096 <br />VII 2008-2011 10.80 201,780 <br />Z 1978-2011 21.55 16,468 <br /> TOTAL AFFECTED LAND 177.71 <br />11 <br />