My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132486
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132486
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:14 PM
Creation date
11/26/2007 12:13:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
3/20/2007
Doc Name
2/1/2007 Geotechnical Report, BuckhornGeotech, ā(Stability Evaluation of Coal Waste Pile No. 4)ā
Section_Exhibit Name
Volume IX Coal Mine Waste Disposal Area No. 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5. Strength Parameters Used in the Stability Evaluations <br /> Foundation Soils Coal Waste <br /> Undrained <br /> Shear Strength, -- 1578 psf <br />Total Slress Su <br />Analyses <br />~ (deg) <br />38 <br />-- <br /> c (psf) 100 - <br />Ettective ~' (deg) 38 30 <br />Stress <br />Analyses c' (osfl 100 0 <br />5.3 Findings of Stability Evaluations <br />Factors of safety for total and effective stress analyses are summarized in Table 6. Output from <br />these critical stability analyses is presented in Appendix E. Total stress analyses model <br />undrained conditions for the gob using undrained shear strengths. Foundation soils were <br />modeled using drained strength parameters (Mohr-Coulomb ~' and c') Based on pore pressure <br />monitoring at Gob Pile No. 2, gob is likely to develop excess pore pressures during construction <br />and behave undrained. Excess pore pressures will dissipate once construction is completed. The <br />time required for complete pore pressure dissipation is a function of the hydraulic conductivity of <br />the gob and length of drainage path. Circulaz and block type failures were considered by the <br />⢠total stress analyses. Critical failures surfaces for the undrained analyses were found to be <br />mostly deep failures through the gob. <br />Effective stress analyses model drained conditions (i.e., no excess pore pressures) for the gob <br />and represent long-term conditions. Effective stress parameters were estimated based on CU <br />triaxial shear tests. As expected, the critical failure surfaces for the drained models were founda <br />to be shallow. For these analyses, the failure surface was forced a minimum of 5 feet into the <br />gob to avoid prediction of extremely shallow critical failure surfaces at or near the surface of the <br />gob. <br />i⢠<br />Possible excavation slopes were first evaluated. These analyses consider a completed excavation <br />prior to gob placement. It is more likely that excavation will proceed during gob placement, <br />however, these analyses provide an indication of the stability of the overall excavation. As <br />indicated in Table 6, the factor of safety for excavations ranges from 1.34 fora 1.SH:1 V <br />excavation to 1.65 for an excavation of 2.SH:1 V. We recommend a minimum factor of safety <br />for the excavation of 1.50 due to the uncertainty of the strength pazameters. It should be noted <br />that the excavation is temporary, and will be buttressed relatively quickly by gob. The gob <br />buttress will increase the factor of safety of the excavation and native soils. An overall <br />excavation slope of 2H:1 V results in a factor of safety of 1.50. Based on the results, a maximum <br />excavation slope of 2H:1 V is recommended for Gob Pile No. 4. The excavation may be made in <br />a benched malmer as long as the overall slope is 2H:1 V or gentler. <br />Following evaluation of the excavations, possible gob geometries were evaluated for excavation <br />slopes of 2H:1 V and 2.SH:1 V. As indicated in Table 6, the critical factors of safety were greater <br />than 1.50 for an excavation subgrade of 2H:1 V and gob slopes up to 3H:1 V. Gob slopes of <br />Bowie Gob Pile No. 4 stability report <br />Project #OS-126-GEO <br />Page I2 of IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.