Laserfiche WebLink
will occur according to recommendations and <br />schedules of SCS. <br />Phase III - 109 acres±. This area will be mined <br />after Phase I and II, and is estimated to occur <br />during the 1990's. Reclamation will begin as soon <br />as practical after mining operations are completed <br />and to be completed within the five year limit <br />allowed by the Act. <br />g. (i) See Reclamation Plan and Details (Attached <br />plan sheet as Exhibit F). <br />(ii) See Exhibit AA - Applicant to comply with SCS <br />recommendations. <br />(iii) Fertilization will be accomplished in <br />accordance with SCS recommendations at time of <br />seeding operations. <br />(iv) See Exhibit E, paragraph c-5. <br />(v) See Exhibit E, paragraph c-4. <br />EXHIBIT F - Reclamation Plan Map - See attached map <br />EXHIBIT G - Water Information <br />The operation upon reclamation is expected to have a <br />very minimal effect upon other water systems in the <br />area since no consumption of water occurs for the <br />reclamation purposes of conservation/wildlife habitat/ <br />recreational uses. The water impoundments will <br />undoubtedly seek a water level equal to the surrounding <br />underground water table such that in effect the impound- <br />ments are no more than an extension of the innate <br />qualities of the preexisting conditions. The under- <br />ground water table in those areas surrounding the <br />site will be relatively unaffected by the reclaimed <br />area. <br />Water from dewatering operations will be pumped into <br />existing ponds or ponds developed for that purpose. <br />No direct discharge to St. Vrain Creek will occur. <br />All excavations and piled materials will be sloped <br />such that runoff from disturbed areas will flow away <br />from the creek to the existing ponds or newly created <br />ponds for that purpose. <br />Wastes from machinery maintenance will be confined to <br />localized areas so that none of those wastes reach <br />water areas. <br />There will be no project water requirements for devel- <br />opment mining phases, other than occasional dust control <br />operations. The amount of taater needed for dust control <br />is not expected to exceed 5,000 gallons per week during <br />Sheet 5 of 6 <br />